Saturday, February 25

Kitchen Refresh, Weeks 3 and 4

We were out celebrating our 25th anniversary at week 3 of the remodel, so I'm doing a catch up here.



Last weekend found us with the windows and doors installed, and drywall from ceiling to floor.  The guys had pre-taped the drywall, ready for mud.  Sofits were built for the new wall cabinets and the window to the stairs has been closed off.  It's still open below the stairs, but all the treads are now blocked off from the kitchen.  Although we had intended to repurpose some of the cedar paneling for wainscot, it ended up not working the way we thought.

Week 3 was a short week due to the holiday, however, things moved along quite well.  Tuesday they finished the prep for the tape and mud dudes.  Wednesday the mud dudes came and did all of the seams, while Ralph and Sean painted the cabinets for the new hutch.  They were just finishing up for the day when we got home, ready to light a huge propane heater in the middle of the dining room to help everything dry - my eyes watered so much from the off-gassing.  Thursday was texture day and when we got home Friday night, everything had been primed.




This coming week should reveal the painted walls, along with the crown molding, the installation of the hutch, and maybe even start to refinish the existing cabinets.  I pick up the new oven on Wednesday, and I've ordered some of the new hardware for the cabinets.  I'm ready for this to be as fabulous as I imagine it should be.